Factory

Factory & Capability

We manufacture dry ice pack sheets with PE film + non-woven + SAP structure.
Stable lead time, OEM printing, and strict QC.

• Structure: PE film (cold-facing) + non-woven (product-facing) + SAP inside.
• Printing: 1–2 colors flexo on the PE film.
• Lead time: 7-10 days standard; 12–15 days printed.
• Package: 50–1000 g per sheet; cartons on pallets.
• Shipping: CIF Qingdao; global logistics support.

Step 1 — Film & Non-woven prep

Incoming inspection and roll slitting.

Step 2 — Sealing & Cell forming

Heat sealing, consistent cell size.

Step 3 — SAP filling

SAP dosing and uniform distribution.

Step 4 — QC & Packing

Seal-strength test, burst test, carton packing.